RYAN HOMES AT PARK VIEW PRESERVE PHASE 2
Client(s): JDT Land Co.
Location: 3894 Capital Reef Wy, Apopka, FL 32712
​
Contract Value: $2.1 Million
Start Date: December 2023
End Date: April 2024
​
Project Overview:
DCFL partnered with JTD Land Co. to deliver the second phase of the Park View Preserve development. This large-scale project involved comprehensive site preparation, utility infrastructure installation, and roadway construction to support the expansion of this residential community.
Scope of Work:
The Park View Preserve Phase 2 project included the following activities:​​​​​
-
Demolition and Erosion Control:
-
Removed existing asphalt and curbs.
-
Installed erosion control measures and inlet protection to safeguard the site during construction.
-
-
Land Clearing and Preparation:
-
Cleared and grubbed over 3 acres to prepare the site for development.
-
-
Sanitary Sewer Installation:
-
Over 2,800 linear feet of 8-inch SDR35 PVC gravity sewer were installed.
-
Installed 15 manholes and 74 sanitary service lines.
-
Tied the new system into an existing sanitary service manhole.
-
-
Stormwater Management:
-
Installed over:
-
850 linear feet of 15-inch RCP.
-
700 linear feet of 18-inch RCP.
-
850 linear feet of 24-inch RCP.
-
200 linear feet of 30-inch RCP.
-
-
Installed 27 storm structure inlets and tied into four existing storm structures.
-
-
Water System Installation:
-
Tied into an existing 8-inch water main.
-
Installed:
-
Over 2,600 linear feet of 8-inch C900 DR18 PVC water main.
-
Over 500 linear feet of 4-inch C900 DR18 PVC water main.
-
6 fire hydrants and 70 water service lines.
-
-
-
Roadway and Sidewalk Construction:
-
Over 8,100 square yards of asphalt, base, and stabilization were installed.
-
Installed over 5,800 linear feet of F curb.
-
Constructed 550 square yards of sidewalk, including 6 ADA ramps with detectable warning pads.
-
-
Conduit Installation:
-
Over 11,800 linear feet of 2-inch Schedule 40 conduits were installed to support future utility needs.
-
Key Highlights:​​​
-
Delivered a fully integrated utility and stormwater management system to support the expansion of Park View Preserve.
-
Improved community access and functionality with new roadways, sidewalks, and ADA-compliant infrastructure.
-
Coordinated closely with JTD Land Co. to ensure the project was completed on time and within budget.