Client(s): Summit Contracting Group
Location: 1100 John Young Pkwy, Orlando, FL 32808
​
Contract Value: $13.8 Million
Start Date: December 2022
End Date: October 2024
​
Project Overview:

DCFL partnered with Summit Contracting Group to deliver a comprehensive site development project for the District West apartment complex. This large-scale endeavor transformed a challenging, muck-filled site into a well-prepared location for a modern residential community. With precision engineering, high-quality materials, and skilled execution, DCFL managed every aspect of the site development process to ensure a solid foundation for the project.
Scope of Work: 
The District West project encompassed:​​​​
  • Land Clearing and Grading:

    • Cleared over 18 acres of land on a site with extensive muck deposits.

    • Hauled off over 7,000 cubic yards of muck.

    • Over 185,000 cubic yards of clean fill were imported to prepare the site for development.

  • Roadway and Paving:

    • Over 9,500 square yards of asphalt, including base and subbase layers, were installed for internal roadways and parking areas.

  • Retaining Wall Installation:

    • Over 500 linear feet of retaining wall were constructed, with an average depth of 8.5 feet, to stabilize the site and support structural integrity.

  • Utility Infrastructure:

    • Installed a new lift station.

    • Laid over 700 linear feet of 8-inch force main and over 1,300 linear feet each of 4-inch force main and 8-inch gravity sewer.

    • Over 800 linear feet of 6-inch sewer laterals were installed to support the site’s wastewater management system.

  • Stormwater Management:

    • Installed over:

      • 200 linear feet of 15-inch RCP.

      • 600 linear feet of 18-inch RCP.

      • 900 linear feet of 24-inch RCP.

      • 300 linear feet of 30-inch RCP.

      • 50 linear feet of 36-inch RCP.

      • 100 linear feet of 66-inch RCP.

    • Constructed 32 new inlet and manhole structures for effective stormwater management.

  • Water Distribution System:

    • Over 1,700 linear feet of 8-inch PVC water main were installed to ensure reliable water distribution for the complex.

Key Highlights:​​​
  • Transformed a challenging muck-filled site into a stable, build-ready location through expert clearing and fill operations.

  • Delivered a complete stormwater and utility infrastructure system to meet the needs of a large-scale apartment complex.

  • Coordinated closely with Summit Contracting Group to ensure the project remained on schedule and met all quality and regulatory requirements.

  • Installation of a 230kV transmission line to documents and specifications.

Impact on the Community:
The District West project supports the growth of affordable and modern housing in Orlando, providing a well-designed and expertly prepared site for a new apartment complex. DCFL’s work ensured the site’s long-term stability and functionality, contributing to the area’s continued development and appeal.

© 2023 by Development of Central Florida, Inc. All rights reserved.