DISTRICT WEST
Client(s): Summit Contracting Group
Location: 1100 John Young Pkwy, Orlando, FL 32808
​
Contract Value: $13.8 Million
Start Date: December 2022
End Date: October 2024
​
Project Overview:
DCFL partnered with Summit Contracting Group to deliver a comprehensive site development project for the District West apartment complex. This large-scale endeavor transformed a challenging, muck-filled site into a well-prepared location for a modern residential community. With precision engineering, high-quality materials, and skilled execution, DCFL managed every aspect of the site development process to ensure a solid foundation for the project.
Scope of Work:
The District West project encompassed:​​​​
-
Land Clearing and Grading:
-
Cleared over 18 acres of land on a site with extensive muck deposits.
-
Hauled off over 7,000 cubic yards of muck.
-
Over 185,000 cubic yards of clean fill were imported to prepare the site for development.
-
-
Roadway and Paving:
-
Over 9,500 square yards of asphalt, including base and subbase layers, were installed for internal roadways and parking areas.
-
-
Retaining Wall Installation:
-
Over 500 linear feet of retaining wall were constructed, with an average depth of 8.5 feet, to stabilize the site and support structural integrity.
-
-
Utility Infrastructure:
-
Installed a new lift station.
-
Laid over 700 linear feet of 8-inch force main and over 1,300 linear feet each of 4-inch force main and 8-inch gravity sewer.
-
Over 800 linear feet of 6-inch sewer laterals were installed to support the site’s wastewater management system.
-
-
Stormwater Management:
-
Installed over:
-
200 linear feet of 15-inch RCP.
-
600 linear feet of 18-inch RCP.
-
900 linear feet of 24-inch RCP.
-
300 linear feet of 30-inch RCP.
-
50 linear feet of 36-inch RCP.
-
100 linear feet of 66-inch RCP.
-
-
Constructed 32 new inlet and manhole structures for effective stormwater management.
-
-
Water Distribution System:
-
Over 1,700 linear feet of 8-inch PVC water main were installed to ensure reliable water distribution for the complex.
-
Key Highlights:​​​
-
Transformed a challenging muck-filled site into a stable, build-ready location through expert clearing and fill operations.
-
Delivered a complete stormwater and utility infrastructure system to meet the needs of a large-scale apartment complex.
-
Coordinated closely with Summit Contracting Group to ensure the project remained on schedule and met all quality and regulatory requirements.
-
Installation of a 230kV transmission line to documents and specifications.