top of page
SQSF3160.JPG

CHICKASAW OUC TRANSMISSION CABLE RELOCATION

Client(s): OUC (Orlando Utilities Commission)
Location: Magnolia Blvd. & S. Ivanhoe Blvd., Orlando, FL 32804
​
Contract Value: $1.0 Million
Start Date: August 2024
End Date: November 2024
​
Project Overview:

DCFL was contracted by the Orlando Utilities Commission (OUC) to relocate transmission cables at the Chickasaw site. This complex project required specialized techniques to address challenging site conditions, including muck removal, dewatering, and precise demolition and reconstruction efforts.
Scope of Work: 
The Chickasaw OUC Transmission Cable Relocation project included:​​​​​
  • Site Preparation and Grading:

    • Demucked the site, removing over 800 cubic yards of unsuitable material.

    • Over 1,900 cubic yards of clean fill were imported to stabilize and prepare the site for further work.

  • Asphalt Demolition and Replacement:

    • Demolished and replaced over 100 square yards of asphalt to restore the site to its original condition post-construction.

  • Dewatering and Trench Safety:

    • Dewatered the site to safely access the transmission cables and ensure trench stability during excavation and construction activities.

Key Highlights:​​​
  • Successfully managed challenging site conditions, including muck removal and water intrusion, to deliver a safe and stable work environment.

  • Restored roadways and infrastructure to original or improved conditions after cable relocation.

  • Coordinated with OUC to ensure minimal disruption to utility services and surrounding areas.

Impact on the Community:
The Chickasaw Transmission Cable Relocation project plays a crucial role in maintaining and upgrading Orlando’s utility infrastructure. By safely relocating cables and restoring the site, DCFL supported OUC’s efforts to enhance service reliability and infrastructure resilience for the community.

© 2023 by Development of Central Florida, Inc. All rights reserved.